| Overview
This
2-day course is designed for personnel involved with the planning, installation
and maintenance of DeltaV™ Process Automation Systems and provides essential
knowledge regarding the power and grounding system for DeltaV equipment.
This course focuses on
specific power and grounding requirements of a control system. You
will learn:
- how to conduct site verifications
- how to audit using “hands-on’’
testing labs
- to detect power and grounding problems on existing sites
Prerequisites A working
knowledge of electronics and AC power basics is suggested. |  |  |
Topics
- Review of Power Basics
- Power System Measurements
- Low
Voltage Power Systems
- Power System Grounding
- Earthing
vs. Grounding
- Connection to Earth
- Equipment Grounding
- Code Requirements
- Building Power Distribution
- Feeders
and Branch Circuits
- Separately Derived Systems
- Power
& Grounding for the DeltaV System
- Single Point Grounding
- Isolated
Ground Installations
- Dedicated Circuits
- DC Grounding
- Verifying New Installations
- Power Quality Problems
- Applying
Power Conditioning
- SIS Power and Grounding Installation
| Location | |
Start
Dates |
| | |
| |
Call to Schedule |
|